PILOT STUDY ON THE APPLICATION OF EMPLOYEE SCHEDULING FOR THE PROBLEM OF SAFETY INSTRUMENTED SYSTEM DESIGN AND MAINTENANCE PLANNING FOR REMOTELY LOCATED OIL AND GAS FACILITIES

Pilot Study on the Application of Employee Scheduling for the Problem of Safety Instrumented System Design and Maintenance Planning for Remotely Located Oil and Gas Facilities

The technology of production, transportation, and processing of oil and gas involves various hazardous processes.To mitigate the risk that these processes pose, the technological solutions work closely with the automated control and safety systems.The design and organisation of maintenance for the automated safety instrumented systems (SIS) have a

read more

Integrated Scheduling of Tasks and Preventive Maintenance Periods in a Parallel Machine Environment With Single Robot Server

In this study, 4 Piece Dining Set the objective of minimizing makespan has been considered for a scheduling problem of identical parallel machines with a single server and unavailability constraints.The unavailability constraints correspond to preventive maintenance periods.In this study, the jobs and the maintenance periods are scheduled simultane

read more

Exploring the link between research funding, co-authorship and publication venues: an empirical study in communication, political science, and sociology

The paper investigates the relationship between research funding and its impact on co-authorship and journal selection in the social sciences, ORTHO EYES specifically in communication, political science, and sociology.It examines whether funded research projects are associated with more co-authors and higher journal prestige, revealing that funded

read more